Kyra – sweater project kickoff

Officially starting on another sweater. Now I know for sure that I have some weird hangup in which I get really antsy if I’m not working on a sweater.

The pattern I’ve chosen is called Kyra Boatneck Pullover. It’s a basic lace and cable pattern from the bottom up, drop sleeves, and minimal shaping/finishing. Unfortunately the pattern is written flat and with 6′ of positive ease. I’ll have to do some calculations once I get my gauge swatch done.

In all likelihood I’m thinking of doing it with reduced ease, possibly 4″ instead of 6″, and making it in the round and then splitting at the top for arm holes and finishing. I’ve done this before with the PurlBee Lattice Top, so I’m fairly confident it will be alright. The difference here is that I will be doing sleeves or some type of sleeve, which will negate the need to decrease stitches for roundness at the shoulder.

Another major concern of the pattern is that it does not have charts. The lace/cable is written and there is a basic measurement schematic for the body and sleeves. Alas, no chart. Based on the completed projects this doesn’t seem to be a problem and many people are able to get through it without a problem.

The yarn I’ve chosen is Shepard’s Wool Worsted Super Wash in the Lilac colorway. My LYS only had three skeins in stock, but I should have enough for a decent length in the body with shortened sleeves, as I had planned on doing anyways.

IMG_1973

Also since I’m reducing 2 inches on the body width that will give me more yarn for length. Each skein is 250 yards, so the master plan here is to do two skeins on the body in the round, third skein will be neckline finishing. Leftovers will be allocated to the sleeves.

I’m also┬áconcerned about where the hem of the sweater will cut off at my waist and will probably do maybe 4″ of ribbing instead of what appears to only be about 2″. This modification is┬ástill up in the air though.

Besides these adjustments, I’m pretty excited to have another layer I can have over my dresses this coming winter…three days away…haha

So far my anti-pants mission has been going well. =)

Also I need to start planning for items to knit to wear in Ireland! Yep, we are definitely going next year! XD